10MV Biomass Project in India

3

Raghavan Sundaragopalan Wed, 2010-03-24 12:23

Raghavan Sundaragopalan · Wed, 03/24/2010 - 12:23

Business

Business Overview: 

With the continuous depletion of fossil fuel and increased pollution control methods advocated by many countries and India being the signatory for the environmental declaration, the Government of India is giving thrust to augment power supply through non-conventional sources and Ministry of non-conventional energy has been set up to promote the same

Industry: 
Project Location: 
Chennai, TN, 600033
India
What are your future milestones, and how much capital will you need to achieve each of the milestones outlined?: 

Product Power Generation / Production
Installed Capacity –Power 10 MW
Power Export 74460000 Units per annum
Capacity Utilization 85% average

Services Desired: 
Accounting
Who is the Customer?: 

The proposed plant is ideally located considering the infrastructure required, i.e., Road, Water, Bio-mass availability, Power Evacuation facilities etc. And the project is very economically viable, considering the policy of Government of India and Government of Tamilnadu

What is the Customer Pain that you are solving?: 

The development of the Power Sector in the country since Independence has been predominantly through State Electricity Boards and Public Sector Undertakings, using mainly fossil fuel and large hydel projects. Since Independence, we have added 100,000 MW as of 2002 from 1362 MW, at the time of independence. The demand for power generation has been increasing quite rapidly due to growth of industries, higher demand from irrigation, rural electrification and increased population etc. The committee appointed by the Power Ministry has estimated to augment the power requirement, the capacity addition required by 2012 is an additional 100,000 MW.

What is the Target Market?: 

The Government of Tamilnadu has taken all earnest steps to promote and develop non-conventional energy and its nodal agency Tamilnadu Energy Development Agency., has identified various sources of energy including generation of power from bio-mass.

Considering the huge potential, the promoters, who are agriculturist cum financiers having credible experience in managing have decided to set up 10 MW biomass power generation plant at TUTICOIN District, Tamilnadu and for this purpose, they have incorporated M/s RSG ENERGY PRIVATE LIMITED, CHENNAI. The project high lights are given below.

Technology

What makes the technology/business unique and have a defendable competitive advantage?: 

The proposed plant is ideally located considering the infrastructure required, i.e., Road, Water, Bio-mass availability, Power Evacuation facilities etc. And the project is very economically viable, considering the policy of Government of India and Government of Tamilnadu

Team

NameTitle
RAGHAVAN SUNDARA GOPALANDIRECTOR

Financials

Amount Sought: 
$15,000,000
If raising funds, what shall the funds be used for?: 

Total Project Cost (Rs. in Lakhs)
-Land & site development 133.65
-Civil works & Structural 663.63
-Plant & Machinery (EPC) 4350.72
-Preliminary & Pre-operative 165.33
-Design & Engineering Consultancy 125.00
-Margin money for WC 40.25
-Interest during construction 262.35
-Contingency 299.97
-TOTAL 6040.90

Funding Stage: 
Growth

Testimonials

With the continuous depletion of fossil fuel and increased pollution control methods advocated by many countries and India being the signatory for the environmental declaration, the Government of India is giving thrust to augment power supply through non-conventional sources and Ministry of non-conventional energy has been set up to promote the same