477 Views
John Monden
Public Profile URL : user/john4
OGUU056854 ?
0
Likes
477
Page views
1
Posts
0
Connections
0
Followers
0
Followings
20
Points

John Monden

Profile

Title: General Manager
Company: MerCimin
Location: Almere FL
Industry: Financial Services
OnGreen Category: Renewable Energy
Biography

Funding of renewable energy projects

We have a UK investment fund that has committed to over $1.1B to our firm for wind farm and renewable energy projects, that we structure and underwrite according to S&P Criteria BBB or better.

This is a ONE-STOP-SHOP for all financial services required to fund Renewable Energy.

Our financial services include:

- Bond Structure and registration
- Investor Liaison
- Underwriting to S&P criteria
- Credit Analysis
- Negotiations with PPA providers
- Import/Export credits
- Interconnect vendors
- Wind speed insurance (without broker fees)
- Environmental Lawyers
- US Gov ITC Grants via Wash D.C. lobbyist
- Kyoto Carbon Credits (from the co. that wrote the documentation)
- 5%+ equity contributions available (if qualified)

We are interested in wind power (USA) first, and other renewables second.

The current appetite is for wind deals that we can reach financial close for during this calendar year.

Optimal wind projects for our investor will have the following basic elements:

1. Wind study by major national firm, with confirmed P50, P75, P90-99 at or near hub height; based on multi year wind data from site and other available sources in vicinity.

2. Financial model showing DCR at P50 wind speed (as confirmed by wind study) at approximately 1.6:1; DCR at P90 1:1. (If a loan period of 15 years is necessary to meet the P50 DCR goal, that is acceptable. Minimum loan period is 10 years).

3. Permits in place

4. PPA Exit Identified or, an alternative (lower quality) temporary off take arrangement, confirmed, to use as an interim price benchmark to determine revenue levels, and DCR, and thus set interest rate.

Assuming a short term PPA with a highly rated utility is implemented during the construction period, (PURFA and/or Government) we would undertake to reset the interest rate to reflect the higher credit quality.

We are willing to meet the PPA utility to prove the client’s finances are in order, (after initial underwriting/credit analysis and investor commitment) so they may secure a finalized long term PPA.

With the above in place, we organize the wind speed insurance, tax grant team, lender, equity investor if needed, turbine supplier if needed.

The result is a non-recourse low interest loan, of which 30% is paid off at the end of construction.

Time is Short.
The U.S.Government ITC grant time is running out~!

Please contact me if we can be of service

With kindly regards
MerCimin Property Development

J. Monden
Netherlands
John@MerCimin.com
john.mercimin@gmail.com
tel +31 (0)36 533 5697
gsm +31 (0)6 53 59 91 92
fax +31 (0)84 712 0561

Employment and Education

Employment

  • MerCiminGeneral Manager | 2005 - current